Concrete price per m³ – quotes with delivery in Proszowice
The price of concrete per m³ is only part of the information you need to compare offers. For an order delivered to site, the quantity, the delivery location, the unloading method and the equipment needed also matter. A quote should show the cost of the order under the agreed conditions.
Have the location of the site, the mix parameters and the planned quantity ready. If you need a pump or access is difficult, tell us straight away. That way it will be clear what the quote has to cover.

Quote termsReady-mix concrete
- Minimum
- 1 m³ with delivery
- Part load
- surcharge stated in the quote
- Equipment
- own concrete pump and mixer pump
- Pump billing
- hourly, including travel
- Collection
- at the plant
What to consider in a quote
Concrete requirements. The strength class, consistence, required properties and admixtures or additions define the mix you order. Do not compare two prices if they are for different parameters.
Quantity. Give the total volume in m³ and say whether the pour is to take place in one day or in stages. Small and large orders may need loads to be organised differently.
Site location. To assess transport, we need the truck-mixer route from the plant in Jakubowice. The distance by car may not match it. We do not use zones or fixed distance surcharges — we calculate the transport cost in every quote for the specific site.
Placing the concrete. Discharging by chute and pumping need different equipment. In your enquiry, describe where the concrete is to be placed and where the vehicles can be positioned.
Date and organisation. Give the planned day, the pace your crew will work at and any access difficulties. Any additional conditions must be discussed before the delivery is confirmed.
Small quantities of concrete
The minimum order with delivery is 1 m³. For a smaller pour, ask about the cost of the whole load — we add a surcharge for a part load, and the amount is given in the quote. The price of the mix alone does not yet tell you the final cost of delivering it to your plot.
Concrete pump and mixer pump
We have our own concrete pump and truck-mounted mixer pump. When you ask for a quote, agree what equipment is needed. The concrete pump and mixer pump are charged by the hour, plus travel — the rates are given in the quote.
Collection
You can collect concrete yourself from the plant in Jakubowice. Ask for a quote for collection and agree the vehicle, quantity and loading time. See the terms for collecting concrete.
How to compare two offers
Check that both are for the same mix and quantity. Make sure you know whether the amount includes transport, how the pump is charged and whether there are extra items related to unloading. Compare prices on the same basis: both excluding VAT or both including VAT.
A price should be dated and linked to the agreed delivery date. If you change the quantity, the parameters or the place of the pour, ask for the terms to be confirmed again.
What to prepare for a quote
- the town or village and municipality of the site;
- the quantity in m³ or, if you do not know it, the dimensions or the design data;
- the type of element and the mix parameters;
- the planned date;
- whether you need a concrete pump or a mixer pump;
- any access restrictions;
- a contact phone number.
You can make a first estimate of the quantity with the concrete calculator. Check the final order with your contractor, especially if the excavation or formwork differs from the design.
Questions about price
How much does 1 m³ of concrete cost?
To give a price, we need the mix parameters and the terms of the order. For delivery, also ask about the cost of transport and of placing the concrete.
Does the price include transport?
Check the scope of the offer in the quote. The price of the mix alone and the price of the whole order with delivery can mean different things.
How much does concrete from a truck mixer with a pump cost?
Ask for the total cost of the concrete, transport and the work of the concrete pump or mixer pump. Give the quantity in m³, the site address and the conditions for setting up the equipment. A single rate for the mix is not enough to price the whole order.
Is there a surcharge for a small quantity?
Yes — we add a surcharge for a part load and state it in the quote. The minimum quantity of 1 m³ does not come with the same transport terms as a full truck.
Does concrete cost more in winter?
Tell us the expected conditions for the pour and the mix requirements. Any difference in price can be set once the solution has been agreed; we do not apply one surcharge to every winter delivery.
How quickly will I get a quote?
Give us your phone number and the site details so that the office can clarify any missing information. How long the quote takes depends on how much still needs to be established. If it is urgent, call us.